Quality Assurance

At Yonglihao Machinery, quality comes from a documented workflow, not just final checks. We support prototypes and production parts with controlled suppliers, clear inspection plans, and consistent records. Our ISO 9001:2015 certification backs our commitment to quality. We provide inspection documents based on your project needs.

Advanced equipment to realise complex parts processing

Inspection Capabilities & Calibration

We use inspection tools that match customer needs and part complexity. All measuring tools are managed under a calibration plan. This supports traceability and reliable measurements.

CMM
CMM
Height Gauge
Height Gauge
Micrometers
Micrometers
Calipers
Calipers
Surface Roughness Tester
Surface Roughness Tester
Hardness Tester
Surface Roughness Tester

Quality Control Workflow

We apply quality controls at each stage to stop problems from growing.

Requirement review (before production): We confirm drawings, tolerances, material, surface needs, critical dimensions, and documentation.

Incoming material verification: We check raw materials against your specifications. We maintain material traceability when you request it.

In-process inspection: We inspect critical features at set intervals. We adjust process settings if we detect any trends.

Final inspection: We check dimensions and visual quality against drawings before packing.

Packing & shipment verification: We check labels, protection, and part separation. This reduces transit damage and mix-ups.

Engineering Inspection

Quality Reports

We provide inspection documents based on your order.

Report Type

What It Includes

Availability

Visual Inspection

Appearance check for surface finish, burrs, scratches, and defects.

Included (by request)

Dimensional Inspection

Measurement of specified dimensions with the right tools.

Included (by request)

First Article Inspection (FAI)

First-piece verification before full production begins.

[Included / Additional]

Material Certificate (MTC/COC)

Supplier material documents and traceability details.

Additional (if required)

Comprehensive Quality Report

A summary of key inspections and quality checks for the order.

Additional (if required)

Nonconformance Handling & Corrective Action

If parts do not meet the agreed specifications, we take structured action. Please report issues quickly after you receive the parts. Provide photos, measured data, and quantities so we can evaluate the issue fast.

Response approach:

Confirm the issue and contain affected parts.

Review drawings, specifications, and our inspection data.

Find the root cause and define corrective actions.

Offer rework, replacement, credit, or a refund based on what is feasible.

RMA / Claim Window:

Please notify us within 7 calendar days of receipt for visible damage or obvious defects.

For dimensional or functional issues, please notify us within 7 calendar days after your inspection.

We will provide an action plan within 7 business days after we get complete evidence.

Rework and Refund Policy

If parts do not meet the agreed specifications, we take structured action. Please report issues quickly after you receive the parts. Provide photos, measured data, and quantities so we can evaluate the issue fast.

Rework is available when:

  • The part does not meet the agreed drawing or specification.
  • The issue was caused by our manufacturing process.
  • We confirm the defect by reviewing evidence or returned samples.

A refund or credit may be considered when:

  • Rework or replacement is not possible in a reasonable time.
  • The issue is confirmed to be our responsibility.
  • We reach an agreement on the resolution method.

Notes: We make custom parts to order. Claims need objective evidence like photos and measurement records. Document any packaging damage when you receive it. Order terms define shipping responsibilities.

FAQs

Are you ISO 9001:2015 certified?

Yes. Yonglihao Machinery has an ISO 9001:2015 certified quality system. We can provide the certificate upon request.

We can provide visual and dimensional inspection reports. First-article inspection (FAI) records are also available. Material certificates (MTC/COC) can be supplied based on your needs.

We can provide CMM reports [if available] for parts that need higher measurement confidence. Otherwise, we use gauges and methods matched to the tolerance.

We confirm CTQ dimensions during planning. We define the measurement method and acceptance criteria before production. This keeps results consistent.

For projects needing traceability, we keep material documents and batch IDs aligned with your order. We can supply material certificates when available.

Yes. Our measuring tools are managed under a calibration plan to support traceable and reliable inspection results.

We use a staged workflow. This includes requirement review, material verification, in-process checks, final inspection, and packing verification.

If an issue is confirmed, we respond with containment and corrective action. Options include rework, replacement, credit, or a refund.

Please report visible damage within 7 calendar days. For functional concerns, report within 7 calendar days after your inspection. Provide photos, data, and quantities for a faster response.

Yes. Send us your required checklist, sampling plan, or report template with your RFQ. We will align our inspection plan and documents before production.

Scroll to Top